With the intensification of the energy crisis and the serious environmental pollution problems, “energy saving and emission reduction” is a hot topic at present. If there is a sustainable environment, it is necessary to continuously develop and utilize new energy, so solar energy is treated as a new energy source. People's attention. Compared with traditional street lamps, solar street lamps have the advantages of energy saving, environmental protection, aesthetics, low operating cost, and intelligent operation. With the advantages of natural environment, installing solar street lamps has very practical significance for strengthening energy conservation and emission reduction. The following is a street lamp installation method that is summarized by the manufacturer of lighting solar street lamps.

(1) Foundation pouring

1. Determine the position of the vertical lamp: If the surface is 1m2, it is soft soil, then the excavation depth should be deepened; at the same time, it is necessary to confirm that there are no other facilities (such as cable, sewer, natural gas pipeline, etc.) under the excavation position, the top of the street lamp There is no long-term shading, otherwise the position should be changed properly.

2. Reserve (excavation) 1m3 pit in accordance with the standard at the position of the vertical lamp position; carry out the positioning and placement of the embedded parts. The embedded part is placed in the middle of the square pit, and one end of the PVC threading pipe is placed in the middle of the embedded part, and one end is placed in the storage area of the battery. Pay attention to keep the embedded parts and foundation on the same level as the original ground (or the top of the screw is on the same level as the original ground, depending on the needs of the site), and one side should be parallel to the road; this will ensure that the rear end of the pole is not biased. oblique. Then, the concrete is poured and fixed with C20 or above, and the vibration of the vibrating rod should not be stopped during the pouring process to maintain the overall compactness and firmness.

3. After the construction is completed, the residual sludge on the positioning plate is cleaned in time, and the impurities on the bolts are cleaned with waste oil.

4. During concrete solidification, it should be watered and maintained regularly; until the concrete is completely solidified (usually more than 72 hours), the chandelier can be installed.

Bell lighting solar street lamp manufacturers to give you a summary of the street lamp installation method.

(1) Foundation pouring

1. Determine the position of the vertical lamp: If the surface is 1m2, it is soft soil, then the excavation depth should be deepened; at the same time, it is necessary to confirm that there are no other facilities (such as cable, sewer, natural gas pipeline, etc.) under the excavation position, the top of the street lamp There is no long-term shading, otherwise the position should be changed properly.

2. Reserve (excavation) 1m3 pit in accordance with the standard at the position of the vertical lamp position; carry out the positioning and placement of the embedded parts. The embedded part is placed in the middle of the square pit, and one end of the PVC threading pipe is placed in the middle of the embedded part, and one end is placed in the storage area of the battery. Pay attention to keep the embedded parts and foundation on the same level as the original ground (or the top of the screw is on the same level as the original ground, depending on the needs of the site), and one side should be parallel to the road; this will ensure that the rear end of the pole is not biased. oblique. Then, the concrete is poured and fixed with C20 or above, and the vibration of the vibrating rod should not be stopped during the pouring process to maintain the overall compactness and firmness.

3. After the construction is completed, the residual sludge on the positioning plate is cleaned in time, and the impurities on the bolts are cleaned with waste oil.

4. During concrete solidification, it should be watered and maintained regularly; until the concrete is completely solidified (usually more than 72 hours), the chandelier can be installed.